Free template

Free tech pack template for apparel brands

A tech pack is the instruction manual a factory builds your garment from. This free Excel template covers every page a factory needs, plus the fields most templates leave out: UPCs, NRF codes, label content and landed cost, so the same file can feed your ERP, your retailers and your customs broker.

Download the template (Excel)11 tabs. Works in Excel, Google Sheets and Numbers. No email required.

What is a tech pack?

A tech pack, short for technical package, is the document that tells a factory exactly how to make a garment: the materials, the measurements for every size, how each seam is sewn, the colors, the labels, the packaging and the target cost. Factories quote, sample and produce from it.

Anything the tech pack leaves out gets decided by the factory instead of you. That is why a vague tech pack costs extra sample rounds, and why a complete one is the cheapest way to get production right the first time.

What is in this tech pack template

Eleven tabs, one per section of a complete tech pack. Yellow cells are for you to fill in. Grey cells calculate on their own. Each tab has one worked example row for a men's jersey tee so you can see the format.

TabWhat it coversWhy it matters
Style SummaryStyle number, season, factory, country of origin, sample stage, target FOB, wholesale and retail, front and back flatsThe factory checks the version and stage before anything else
BOMEvery fabric, trim, label, thread and packaging item with supplier reference, quantity per garment and costTotals feed the costing tab, so a trim change shows up in your margin
MeasurementsPoints of measure, how to measure each one, tolerances, grade rules and a fit sample column that flags anything out of toleranceOther sizes calculate from the base size and grade rules
ConstructionSeam by seam: ISO 4915 stitch type, stitches per inch, seam allowance, thread and sketch calloutStops the factory substituting a cheaper stitch
ColorwaysYour color code, the NRF color code, Pantone reference and lab dip approval statusThe NRF code is what many retailers expect in EDI orders and ship notices
Size and SKUEvery color and size with SKU, UPC and prepack ratioThe same list your ERP, Shopify and retailer EDI will run on
Labels and PackagingFiber content, country of origin, RN number, care instructions, hangtags, folding, polybag, carton and GS1-128 labelMissing label content gets goods relabeled or refused
CostingFOB from the BOM plus labor, then duty, freight and fees to landed cost, wholesale and retailShows whether the style makes money before you sample it twice
Sample TrackerEach round from proto to top of production, with dates and fit commentsTurnaround time per round is your real development calendar
RevisionsEvery change, who asked for it and who approved itProves what changed when a factory builds from an old version
How to useLegend, file naming and a checklist before you sendKeeps every style's file consistent across a team

How to fill in a tech pack, in order

The fields most tech pack templates leave out

Most free templates stop at the sample: sketches, materials and measurements. The fields below are what turn a tech pack into data your whole operation can use. Each one ends up in your ERP, your EDI documents or your customs entry. When the tech pack has them wrong, or does not have them at all, someone retypes them later, and that is where mismatches between the purchase order, the ship notice and the carton label start.

How to write points of measure that factories follow

A point of measure is only useful if two people measuring the same garment get the same number. Each one needs three things: where to start, where to end, and whether it is a full or half measurement.

Tech pack mistakes that cost a sample round

Frequently asked questions

What should a tech pack include?

At minimum: a style summary with flat sketches, a bill of materials, a graded measurement spec with tolerances, construction details, colorways, label and packaging requirements, and a revision log. Adding the size and UPC matrix and target costing makes it usable beyond the sample room.

Is a tech pack the same as a spec sheet?

No. The spec sheet is the measurement chart, one page of the tech pack. The tech pack also covers materials, construction, color, labeling, packaging and cost.

Do I need a tech pack for a small first production run?

Yes. Small runs are where a missing detail hurts most, because there is no budget for another sample round. Even a factory that offers to work from a reference garment will quote and sew more accurately from a tech pack.

Should I use Excel or PLM software for tech packs?

A spreadsheet works well for a handful of styles. Once you manage dozens of styles across seasons, PLM or an ERP with product development keeps versions, BOMs and costing in one place and passes SKUs and UPCs straight into ordering, without anyone retyping them.

Related guides and tools

Landed cost calculator

Turn the factory price on your tech pack into what a unit really costs in your warehouse.

Open the calculator
Keystone pricing calculator

Work from landed cost up to wholesale and retail, or from a target retail price down to the factory price to quote.

Open the calculator
Apparel sourcing transit times

How long each sourcing country takes to reach your warehouse, and the date you need to place the order.

Open the calculator
Apparel supply chain guide

Country of origin, yarn-forward rules and duty risk, and why switching factories takes longer than it looks.

Read the guide

Product data breaking between design and the warehouse?

We map how styles, SKUs and UPCs move from the tech pack into your ERP, your retailers' EDI and your customs entries, and fix the points where they get retyped. If your flow is already clean, we will tell you that.

Book a call